Add moisture by blowing into hole A. This helps the line to slide smoother through the Pro Jectile.
Load the leader material from A to B.
Tie in a svirvel to the back-end of the leader and pull it into hole B for secure position. The svirvel is then mounted onto the main-line.
The hook is tied on the tip-line going from hole B.